ISO Certification

Certificate HK 10/00004

ISO 9001:2004
Quality Management System

Certificate HK 10/00039

ISO 14001:2004
Environmental Management System

Certificate HK 10/00007

OHSAS 18001
Occupational Health and Safety Management System

 

Corporate Brochure


Please click on the above photo to download our corporate brochure.

News

Date: 25 Apr 2012
Top Builders International Co., Ltd. Awarded Contract for Galaxy Phase 2 Foundation Works

TBI has been awarded a substantial contract for the foundation works in Galaxy Phase 2. The works covers a site area of 35,000m2, and comprises demolition and site cleaning, hoarding, excavation and lateral support (including the cutting of pile heads), and the construction of pile caps, basement slab and retaining wall construction.

 

Date: 23 Apr 2012
Top Builders held career-talk in the University of Macau

Last Saturday, Top Builders, amongst a host of other international companies, was honoured to be invited by the University of Macau (UMAC) to participate in a career-event for students studying in the Faculty of Engineering. The event was aimed to assist engineering students to make a more informed choice on their future career upon their graduation from the UMAC.

Top Builders was glad to be able to help out students in every way we could and was overwhelmed by the enthusiastic responses from students on the day!

 

Date: 10 Apr 2012
Top Builders International Co. Ltd. Awarded Contract for fit-out works for the Macao Judiciary Police Office in Edificio Xin Hua (司法警察局新華大廈裝修工程)

TBI was recently awarded a joint-venture contract of worth MOP 115M by DSSOPT for the refurbishment and fit-out works for the Macao Judiciary Police Office in Edificio Xin Hua, where TBI takes a 40% stake in the joint-venture. The project comprises fit-out works for 14 floors, including MEPF works, in the existing building. This is one of the major fit-out works awarded to TBI since the fit-out works in Malo Spa & Clinic and Mong Há Social Housing Phase 1.

 

Date: 28 Mar 2012
Top Builders International Awarded Contract for Coloane Ka-Ho Tunnel – Section 1 (路環-九澳隧道-南戶外路段(第一區)建造工程)

TBI was recently awarded a contract worth MOP 128M for the construction of the 1st section of the Coloane Ka-Ho Tunnel by GDI, with TBI taking 40% stake in a joint venture with two other local contractors. The total length of the road is 1.2 km.

The works include the cutting and filling of a total of over 80,000 m3 of soil and rock, the use of bored piles with dia. from 600 to 1200 mm (with retaining walls), the installation of rain water and sewage underground drainage systems, and the construction of base and pavements of the road including all traffic accessories.

 

Date: 03 Jan 2012
Top Builders Group Ltd. Awarded Contract for Link-Bridge between Venetian Parcel 2 and Parcel 5&6

TBG was recently awarded a contract worth over 100M by Venetian Macao Resort for the construction of a link-bridge between Venetian Parcel 2 and Parcel 5&6.

The link bridge is approximately 160m in length and is made of structural steel. Its features include the use of aluminium cladding, curtain wall and metal roofing system. The middle abutment of the bridge is supported by a bored pile of 80m in length and 2.5m in diameter, while PPC piles are used in both ends of the bridge.

 

Date: 30 Sep 2011
Top Builders International Awarded Contract for Construction Works in Ilha Verde Lote 3 (青洲坊)

TBI was recently awarded a joint-venture contract of MOP 600M by GDI for the construction of social housing in Ilha Verde Lote 3, in which TBI takes a 50% with another local contractor. The project comprises the construction of a basement (3 stories), podium (3 stories) and 2 separate towers of 34 stories, which in total includes 289 car parks, 276 bike parks, 808 m2 of commercial area, 8,800 m2 of social area and 770 residential flats.

Construction-wise, the whole complex is supported by over 100 bored piles of dia. 1 to 2.5 m with depth 35 to 55 m, while over 60,000m3 of soil is to be excavated. Furthermore, in order to fast-track the project, TBI has decided to deploy the “top-down” method, a building technique which allows a high- rise superstructure and its sub-basement to be built simultaneously. TBI is confident that this method will bring successful completion of the project, despite the uncommon use of it in the Macau construction scene due to its difficulty.

 

Date: 1 Aug 2011
Top Builders Group Ltd. is proud to receive the Certificate of Merit from the Macau Government for its proactive approach in providing employment opportunities for the disabled.

 

Date: February 11
Top Builders International Awarded Social Facility Fit-out Works for the new Mong Há Social Housing Phase 1

Top Builders International was awarded the Social Facility Fit-out Works for the new Mong Há Social Housing Phase 1 by the Gabinete para o Desenvolvimento de infra-estruturas.

The BaiSun Ceremony (pictured above) was held on 1st April 2011 to commemorate the commencement of this six month Contract valued at MOP38,600,000. The Contract scope includes building fit-out works and associated mechanical and electrical works.

 

Date: February 11
Top Builders Group Awarded Macau Construction Health and Safety Awards

Top Builders Group was presented with several safety awards on 24th February 2011 at the Macau Construction Health and Safety Awards Ceremony which was sponsored by the Macau Labour Bureau.

  • Building Construction Site ( Category A Trade Contractor) Gold Award
  • The Best Safety Management System Silver Award
  • The Best Safety Management staff (Macau Category) Silver Award
  • The Best Safety Management Staff (Hong Kong Category) Excellence Award
  • The Best Health and Safety Worker Outstanding Achievement Award

 

Date: May 10
Top Builders Group Ltd. Awarded various contracts for Venetian Parcel 5 & 6 Resumption Works

TBI was recently awarded various trade contract packages for Venetian Parcel 5 & 6 Resumption Works. The scope of works of these contracts include completion of the remaining concrete structures, modification of existing structures, external works and hard landscape works, etc. These contracts are part of the essential advance works to be completed at the early stage, prior to the resumption of the development in full scale. It is anticipated more contracts will be taken out for tender shortly and Top Builders will be actively involving in the tender. The commencement ceremony was held on 4 June 2010 at Venetian Parcel 5 / 6 Site. A number of guests took part in this memorable event. Being a Chinese Culture to pray for safety and successfulness, our Managing Director Forest Tang took the lead for cutting roast pigs. Five roasted whole pigs were finished by the attendees in minutes !

 

Date: September 09
Top Builders International Awarded Site Formation Contract for Depot Area for Macau LRT Phase 1

TBI was recently awarded the contract for Site Formation of Depot Area for Macau LRT Phase 1 by Gabinete Para As Infra-estruturas de Transportes (GIT). This is the first major contract awarded for the Macau Light Rail Transportation System. The scope of the work includes site formation for the Light Rail Depot and relocation of the Firemen Training Centre in the vicinity of Macau International Airport. The opening ceremony for the project was held on 8 September 2009 at the new Depot site. A number of project Stakeholders and industry associations attended the opening ceremony including GIT, Gabinete para o Desenvolvimento de Infra-estruturas (GDI), Direccção dos Serviços para os Assuntos de Tráfego (DSAT), Macau Construction Association, Macau Construction Machinery Engineering Association and PAL Asiaconsult Ltd.

Link to TDM news: http://www.tdm.com.mo/c_news/?v=87355

 

Date: February 09
Top Builders International Win Award at the 1st Venetian Macao Business Partner Awards

Forest Tang, Managing Director of Top Builders International received the Distinguished Business Partner Award from William P. Weidner President of Las Vegas Sands Corporation at the 1st Venetian Macao Business Partner Awards Ceremony held in Macao on 20 February 2009.